Lifting, transportation, unloading and relocation - Longxiangxing Logistics

Update:2025-06-26| View:633

Integrated hoisting-transport-unloading-positioning logistics is a full-process solution designed for non-standard oversized equipment, heavy machinery, and precision instruments. It breaks away from traditional fragmented outsourcing by unifying "hoisting-transport-unloading-positioning" operations under single-provider coordination, achieving maximum efficiency, minimal risk, and optimal cost through specialized synergy and advanced equipment.

Technical highlights, implementation workflow, and benchmark cases are detailed below:

Large Power Equipment (Transformers, Generators) | Eliminates vibration/tilting risks from multiple transfers, reduces coordination errors |

Wind Power Equipment (Blades, Nacelles) | Solves ultra-long blade (80m+) turning challenges, maintains aerial stability through coordinated lifting |

Chemical Reactors/Pressure Vessels | Requires millimeter-precision positioning of 300-ton+ equipment on foundation bolts |

Precision Semiconductor Equipment | Ensures constant-temperature vibration control, eliminates micro-vibration from manual handling |

Modular Buildings/Bridge Components | Enables 1,000-ton module integrated lifting, shortening assembly cycles |


Longxiang Logistics leverages industry expertise and comprehensive capabilities to enable Goldwind's delivery of oversized, overweight, and irregular cargo (blades, towers) to designated ports for offshore photovoltaic projects.

This successful execution provides a referenceable solution for similar needs, marking our breakthrough in新能源 sector logistics and solidifying our heavy-haul competence for future non-standard operations.


A - Blade Transport Flowchart:


Route Survey: Toll Station Inspection - Complex Permitting Process - Compliance Verification


(Cargo Matching & Permit Compliance: Strict Dimensional Controls)

Highway Access Granted (1-4 Day On-Site Waiting Period)


B - Front-End Roller System


Photovoltaic Module Hoisting


Final Unloading & Hoisting (Yangzhou Port):


Photovoltaic Module Hoisting




Nacelle Hoisting


Yangzhou Offshore Wind Blade Integrated Hoisting-Transport-Unloading Project Summary

- 107m blades required navigating 12 hairpin turns from port to mountain peak site, impossible with conventional segmented transport.

**Integrated Solution Highlights:

1. Specialized Equipment Design:

- Integrated blade transport frame with hoisting turntable for direct ship-to-frame loading

- Active hydraulic balancing system compensating centrifugal forces during turns

2. Dynamic Route Management:

- Lead vehicle with LiDAR obstacle detection adjusting SPMT axle angles in real-time

- Coordinated turntable-crane rotation for blade positioning at installation site

Performance Advantages:

- Single blade transport time reduced from 72hrs to 18hrs

- Structural stress maintained below 30% of design limits


Core Competitive Advantages of Integrated Logistics:

> Systemic reengineering of logistics chains through integrated operations

> - Technology-Driven: Specialized equipment + digital monitoring ensure absolute safety

> - Process Visibility: Eliminates coordination gaps, reducing both time and cost

> - Accountability: Single-point responsibility for full process management

> **Ideal for: Critical equipment with unit value >$750k or downtime costs >$150k/day**

> Emerging as the new standard in heavy logistics for modular construction and advanced manufacturing.


We welcome inquiries with specific equipment parameters (weight, dimensions, precision requirements) or project scenarios (offshore/mountainous/industrial) to develop tailored integrated solutions and cost models!