Jiangsu Yizheng - Ultra High Case
China Mobile Yangtze River Delta (Yangzhou) Computing Power Center Yizheng Data Center
The biggest pain point and blind spot of the Yizheng Numerical Calculation Center's integrated logistics project for oil, light, diesel, and storage is the end lifting. Our company provided multiple project drill plans for the early road test evaluation. Although the details of non-standard entry for large items are small, the end delivery involves the overall project delivery of upstream and downstream. This lifting experience has been summarized by our company on the basis of operation and can be widely used in later projects. It is recommended and compiled into professional operation and maintenance experience.